Press Mechanical Failure

ILC Assignment:

  • Site inspection of the insured’s press.
  • Determine whether the mechanical failure was due to a maintenance issue.
  • Determine if the repairs and their associated costs are fair and valid.

    ILC Inspection Details:

      • ILC inspected the machine, reviewed the repairs, and conducted an interview to understand the loss and determine if the repair costs were valid.
      • ILC performed a desktop review and gathered information on how the loss occurred.

    Summary:

    • ILC determined that the insured’s press failure was due to a mechanical breakdown rather than a lack of maintenance.
    • The total of $31K to bring the press back to pre-loss condition provided by the manufacturer is fair and valid.