Case Study

Reduced Costs Over $3.5M

Contract Manufacturer of Life Science Equipment

Case Study

Fire
Heat
Soot
Water
Product Contamination

Services Provided

Expert Analysis
Solution Provider
Technical Clerking

The Situation

A fire disrupted operations at a critical engineering firm, threatening the loss of numerous proprietary components essential to the production of scientific laboratory equipment. As a global supplier, business interruption posed a major risk.

Equipment Impacted

  • Mass Spectrometers
  • Residual Gas Analyzers
  • Vacuum Test Chambers
  • Parts Inventory Consisting of Various High-performance Materials

Value-Driven Solutions

Immediate Mobilization

Rapid deployment to assess damage and develop a recovery strategy that minimizes downtime and financial impact.

Technical Clerking

Expert coordination across all restoration activities delivers significant cost savings and ensures project efficiency.

LC Expertise

Deep technical insight enables us to uncover recovery solutions that prevent total loss and preserve asset value.

Life Science Equipment

The Results

Repair vs. Replace

ILC's solution to repair vs. replace the equipment resulted in a cost reduction of $2 million.

Time Savings

Repaired equipment was repurposed for new product development, allowing the lead scientist to resume operations and meet critical contract deadlines.

Contractor Coordination

ILC streamlined previously disorganized repair efforts through expert technical clerking, enhancing efficiency and saving approximately $970,000.

Inventory Recovery

Cleaning and recertifying high-value inventory avoided $600,000 in replacement costs.

 