Case Studies

Project Recaps

Select an image to learn more about the project recap from ILC

Chemical Feed Water Line – Water Damage

Chemical Feed Water Line – Water Damage

ILC saved our client over $1.6m by identifying pre-existing conditions.

View Case Study
Dust Collector – Fire Damage

Dust Collector – Fire Damage

A Like, Kind, and Quality replacement quote provided by ILC was $98,205 less than the quote supplied to the insured.

View Case Study
Air Handler Unit – HVAC Failure

Air Handler Unit – HVAC Failure

ILC was able to assist the insured with located the appropriate repair technicians to repair their equipment in a time...

View Case Study
Automotive Paint Booth – Power Anomalies

Automotive Paint Booth – Power Anomalies

After careful evaluation, ILC concluded that repairing the paint booth would be the most efficient and cost-effective way to return...

View Case Study
Fire Pump System – Water Damage

Fire Pump System – Water Damage

Successfully reducing electrical supply repair cost by $3,635 with a repair quote obtained from the fire system vendor.

View Case Study
Healthcare Equipment – Fire Damage

Healthcare Equipment – Fire Damage

Through value-added consulting, ILC helped reduce the client’s claim costs by over 97% and expedited the insured’s return to business.

View Case Study
Horizontal Grinder – Mechanical Failures

Horizontal Grinder – Mechanical Failures

ILC determined that the recent grinder failure was a direct result of improper repairs, insufficient and untimely maintenance, and misuse...

View Case Study
Vulcanizing Pressure Vessels – Corrosion

Vulcanizing Pressure Vessels – Corrosion

ILC confirmed that continued use of the pressure vessels was a safety concern and that replacing the vessels was the...

View Case Study
HVAC – Major Corrosion

HVAC – Major Corrosion

ILC determined that the severe corrosion damage was a result of continued operation with failed components and not the result...

View Case Study
Commercial Elevator – Hurricane Damage

Commercial Elevator – Hurricane Damage

Over $24,000 was saved in restoring an elevator to pre-loss condition.

View Case Study
Concrete Batch Plant – Fire Damage

Concrete Batch Plant – Fire Damage

Over $51,000 was saved when ILC determined that the insured's conveyor system could be restored to pre-loss condition.

View Case Study
Beverage Can Production Equipment – Fire Damage

Beverage Can Production Equipment – Fire Damage

Clerking the cleaning process, tracking manpower and equipment use, and providing daily reports to our client helped identify $600,000 in...

View Case Study
Aluminum Casing Line – Fire Damage

Aluminum Casing Line – Fire Damage

ILC’s comprehensive solution to repair vs. replace resulted in a $1.5M savings for the client…

View Case Study
Metal Processing Equipment – Fire Damage

Metal Processing Equipment – Fire Damage

ILC’s expertise in equipment damage valuation and project management helped to reduce claim costs by over $700,000…

View Case Study
Film Line – Fire Damage

Film Line – Fire Damage

The ILC Project Management Team provided a rebuild vs replace solution, $1.67M in savings, and a 14-month reduction lead time…

View Case Study
Saturator Converting Line – Undetermined Explosion

Saturator Converting Line – Undetermined Explosion

ILC saved the Insurance Carrier almost $12MM in Business Interruption and avoided having to replace the entire line…

View Case Study
Boiler System Repair – Freezing Pipes & Water Damage

Boiler System Repair – Freezing Pipes & Water Damage

Expertise in providing solutions to return the equipment to pre-loss condition and reduce business interruption expenses saved the client $86,821...

View Case Study
Agricultural Equipment Manufacturer – Tornado Loss

Agricultural Equipment Manufacturer – Tornado Loss

ILC’s recovery efforts yielded significant loss reductions by reducing the initial machinery ROM by more than $20M…

View Case Study
Indoor Water Park Flood Loss

Indoor Water Park Flood Loss

The quick action of ILC’s consultants to address repairs from the loss helped limit the downtime to two days, saving...

View Case Study
MRI Water Damage Loss

MRI Water Damage Loss

With the assistance of ILC, this claim of $108,000.00 was reduced to only $6,000.00….

View Case Study
CNC Machine Breakdown

CNC Machine Breakdown

ILC obtained a repair quote that was over $600,000 less than the replacement quote supplied by the insured…

View Case Study
Electrical Control Systems

Electrical Control Systems

ILC saved client nearly ONE MILLION DOLLARS from the original estimate.

View Case Study
Packaging and Printing

Packaging and Printing

ILC’s expertise helped determine that a cost of $100,000 would bring the insured back to pre-loss condition instead of a...

View Case Study