The Hidden Failure Behind a Rooftop Unit Shutdown
Electrical Malfunction
Case Study
ILC uncovered a $4,082 repair that could have prevented 12 months of temporary cooling costs exceeding $100,000 per month
Services Provided
Technical Consultation
Cause of Loss Analysis
Coordination of Independent Laboratory Evaluation
Defensible Technical Reporting
The Situation
A specialty rehabilitation and long-term acute care hospital caring for patients recovering from disabilities caused by injuries or illnesses, or from chronic or complex medical conditions was affected by a failure of a rooftop cooling system (RTU). Hospital and patient care applications for RTU’s typically have a life-safety based continuous duty cycle. The location involved a hot summer climate which placed high duty cycle demands upon cooling equipment.
Equipment Impacted
- YORK-brand, Rooftop mounted cooling unit (RTU)
Value-Driven Solutions
Cause of Loss Determination
ILC confirmed the Cause of Loss to be a failure of the Main Control Board in the RTU.
System Failure Analysis
ILC hired an independent testing laboratory to evaluate the integrity of the Main Control Board. The laboratory tests showed that the board had failed components, which confirmed the report by the service technician for the RTU.
Scope & Cost Evaluation
ILC identified a $4,082.00 Main Control Board replacement, which could have saved in excess of $100K per month in temporary cooling costs.
The Results
Defensible Cause of Loss
ILC obtained independent laboratory evaluation to determine the Cause of Loss, which confirmed a report by the service technician.
Accurate Claim Development
Efforts by ILC showed that utilization of temporary cooling equipment was excessive and not cost-effective, as a solution to the failure of the RTU.
Real Claims, Real Results