The Situation

Equipment at a concrete batch plant was damaged in a fire, and an assessment was required to determine whether the equipment could be repaired or required replacement. The process involved identifying which repairs or replacements were necessary, estimating the cost to restore the equipment, developing a repair schedule, and calculating the value of the damaged equipment for both replacement cost and actual cash value.

Equipment Impacted

  • 5-Yard Portable Batch Plant

  • Structural Components

  • Electrical Components

  • Weighing System

  • Supporting Equipment

  • Conveyor System

Value-Driven Solutions

Equipment Damage and Repairability Assessment

A detailed inspection of the concrete batch plant and its supporting machinery and equipment was conducted to assess thermal damage and determine whether the equipment could be repaired. The evaluation focused on structural integrity, electrical systems, and the weighing components of the5-yard portable batch plant and assessed which systems could be safely restored.

 

Replacement Scope and LKQ Validation

Replacement estimates were reviewed and compared against Like, Kind, and Quality equipment standards. A competitive LKQ replacement quote was secured, and discrepancies in the insured’s proposal were identified, including unsupported equipment inclusions and missing mounting components.

 

Valuation Analysis and Cost Verification

Comprehensive Replacement Cost Value and Actual Cash Value analyses were prepared to establish accurate and defensible equipment valuation. Cost comparisons were conducted to assess the feasibility of repairs for salvageable components, including the conveyor system.

Fire Damage at Concrete Batch Plant

The Results

Targeted Repair and Replacement Strategy

The evaluation confirmed that specific batch plant components required replacement due to severe thermal damage, whereas the conveyor system could be restored to its pre-loss condition.

Verified Equipment Valuation

Replacement cost values and actual cash value calculations were established, providing stakeholders with accurate and defensible equipment valuations for claim resolution.

 

Reduced Replacement Cost Exposure

The LKQ replacement quote reduced projected replacement costs by more than $50,000 and identified scope discrepancies within the insured’s estimate, preventing unnecessary claim expenses.