Case Study

Reduced Claims Cost of Nearly $3M

Fire at Aluminum Beverage Can Manufacturing

Case Study

Fire/Smoke
Water Damage

Services Provided

Expert Analysis
Technical Clerking

The Situation

A massive fire broke out at an aluminum can manufacturing plant during the early stages of its production setup. The resulting damage caused by the fire delayed the plant's startup, resulting in potential lost revenues for the insured.

Equipment Impacted

  • Specialized Conveyance System Equipment
  • Beverage Can Decoration Machinery
  • Can Cleaning & Drying Systems
  • MCC Equipment
  • Operator Control Centers

Value-Driven Solutions

Immediate Restoration

Initiated daily meetings with restoration firms, the insured, and client to resolve equipment issues and expedite repair vs. replace decisions.

Repair/ReplacePlanning

Collaborated with contractors to develop a strategic plan for technical cleaning, repair, or replacement.

Restoration Oversight

Monitored work by multiple entities—including the OEM,Belfor, Bamcor, and RTI—to ensure quality and progress.

Canpack 6

The Results

Reduced Costs

$2.45M restoration cost vs. $4.82M RCV initial loss estimate.

Manpower and Equipment Tracking

By clerking the cleaning process and delivering daily reports, ILC identified $600,000 in duplicate invoices within the $6.9M submitted, leading to significant cost recovery for the client.

 

Case Studies

Real Claims, Real Results

The Experts Behind the Best Outcome.