Indoor Water Park Flood Loss

Indoor Water Park Flood Loss

We saved our client over $400,000 by identifying pre-existing conditions. ILC ASSIGNMENT: After a flood incident, ILC was assigned to conduct a comprehensive inspection of the mechanical rooms at an indoor water park resort. A complete assessment of the mechanical...
MRI Water Damage Loss

MRI Water Damage Loss

ILC ASSINGMENT: The scope of the ILC assignment involves a comprehensive examination of an MRI Machine to determine the full extent of damage sustained. Through a meticulous inspection, the goal is to evaluate the feasibility of restoring the MRI to its pre-loss...
CNC Machine Breakdown

CNC Machine Breakdown

ASSIGNMENT:Machinery experts from Industrial Loss Consultants were called upon to evaluate damages to a CNC machine at a concrete batch plant following an alleged mechanical failure. The ILC Consultant conducted a thorough inspection to determine the feasibility of...
Electrical Control Systems

Electrical Control Systems

ASSIGNMENT: ILC was asked to visually inspect 48 test stations reportedly damaged by fire at a manufacturing plant. During the investigation, it was discovered that the insured claimed that 34 critical components and parts were either obsolete, out of date, or no...
Packaging and Printing

Packaging and Printing

ILC ASSIGNMENT:When three printing presses were damaged by a lightning-induced power surge, the insured’s manufacturing plant was presented with a major dilemma. The presses were outdated and could not be replaced with original equipment manufacturer parts making the...