by DigitalDestination | Jan 26, 2024
ILC ASSIGNMENT We inspected the insured’s equipment, damaged in a fire, to determine if restoration to its pre-loss condition is feasible or if replacement with new equipment is necessary. Our assessment included defining the scope of work, estimating costs, and...
by DigitalDestination | Nov 20, 2023
Loss Details During a new plant installation at an aluminum beverage can manufacturing plant, a fire occurred while welders were working above a conveyor line causing the vinyl belting material to catch fire. The fire caused damage to crucial components on three...
by DigitalDestination | Nov 8, 2023
ILC Difference:Project ManagementEach consultant has an in-depth understanding specific to the process and equipment used by the insured – spanning a wide breadth and depth of machines and processes. Reduction in Business InterruptionCapability to manage costs and...
by DigitalDestination | Nov 8, 2023
ILC Difference:Equipment and machinery damaged to a manufacturing plant can be a detriment to an insured’s ability to meet order deadlines and keep their customers happy. Understanding the inner workings, components, and parts in these types of facilities is the only...
by DigitalDestination | Nov 8, 2023
ILC Difference: Project Management Each consultant has an in-depth understanding specific to the process and equipment used by the insured – spanning a wide breadth and depth of machines and processes. Reduction in Business Interruption Re-Engineering the Technology...