Vulcanizing Pressure Vessels – Corrosion

Vulcanizing Pressure Vessels – Corrosion

ILC ASSIGNMENT Identified the cause and extent of damage and confirmed the costs associated with the replacement of two vulcanizing pressure vessels used to vulcanize rubber hose materials. Download PDF ILC ANALYSIS The insured’s personnel discovered that...
HVAC – Major Corrosion

HVAC – Major Corrosion

ILC ASSIGNMENT We investigated the cause of damage and the repairability of a non-serviceable roof-mounted heating ventilation and air conditioning (HVAC) equipment. The insured suspected the equipment was damaged in a weather-related event, particularly after finding...
Commercial Elevator – Hurricane Damage

Commercial Elevator – Hurricane Damage

ILC ASSIGNMENT Conducted a site inspection of the insured’s elevator located in a nine-story historic building. Gathered and reviewed information related to the elevator breakdown loss. Assessed the repairability of the elevator machines, and if restorable,...
Concrete Batch Plant – Fire Damage

Concrete Batch Plant – Fire Damage

ILC ASSIGNMENT We inspected the insured’s equipment, damaged in a fire, to determine if restoration to its pre-loss condition is feasible or if replacement with new equipment is necessary. Our assessment included defining the scope of work, estimating costs, and...
Beverage Can Production Equipment – Fire Damage

Beverage Can Production Equipment – Fire Damage

Loss Details During a new plant installation at an aluminum beverage can manufacturing plant, a fire occurred while welders were working above a conveyor line causing the vinyl belting material to catch fire. The fire caused damage to crucial components on three...