Gun Manufacturing Facility – Mechanical Breakdown

Gun Manufacturing Facility – Mechanical Breakdown

Expedited Solution Prevents Major Downtime and Safeguards Client Contract ILC ASSIGNMENT The insured was using a broaching machine and broaching bar to produce gun barrels when the broaching bar shattered during operation. At the time, the insured was under contract...
Chemical Feed Water Line – Water Damage

Chemical Feed Water Line – Water Damage

ILC saved our client over $1.6m by identifying pre-existing conditions. ILC ASSIGNMENT Industrial Loss Consultants was tasked with assessing the damage caused by a failure in a chemical feed water line attached to a condenser water system. This failure resulted in...
Dust Collector – Fire Damage

Dust Collector – Fire Damage

ILC ASSIGNMENT We inspected the insured’s dust collector, which had been involved in a fire, determined its restorability to pre-loss condition, assessed the scope of work, estimated costs, and established a timeframe for the restoration process. Additionally,...
Air Handler Unit – HVAC Failure

Air Handler Unit – HVAC Failure

LOSS DETAILS The Wellness and Fitness Center, operated by the insured, faced three years of ongoing maintenance repairs to sustain the functionality of the air handler. Frustrated with the continuous issues, the insured expressed a keen interest in replacing the aging...