Livestock Rendering Plant

LIVESTOCK RENDERING PLANT

Project Management / Betterments Reduction Identified $4.5M in Betterments.

 

EQUIPMENT IMPACTED:

  • Rotary Grinders
  • Rotary Screens
  • Product Pressers
  • Centrifuges
  • Water Treatment Equipment
  • Environmental Control Equipment
  • Crax Bin
  • Thermal Oxidizer
  • Boilders
  • Process Condenser
  • Storage Conveyance Systems
  • Material Pumping Systems

SITUATION:

A major fire at a rendering plant caused severe damage to specialized processing equipment, resulting in an immediate facility shutdown.

RESULTS:

  • Reduced Costs: The insured initially submitted $1.83M in equipment damage. ILC validated and approved $17.33M, identifying and removing $4.5M in betterments from the claim.
  • Client Confidence: Demonstrated ILC’s value as a trusted partner in resolving complex, high-stakes machinery losses.

VALUE-DRIVEN SOLUTIONS:

Weekly Focus Meetings: Participated in ongoing restoration meetings with client, the insured, and equipment manufacturers for nearly two years to keep the claim progressing efficiently.

Damage & Cost Scope Reviews: Collaborated with the insured and fabrication partners to define and agree on repair, replacement, and betterment scopes – reviewing extensive equipment designs and process flow diagrams.

EPA Documentation Analysis: Assessed EPA and manufacturer documentation to verify code-driven upgrades, uncovering discrepancies that led to significant cost savings.